CBG EPC

CBG EPC & Technology Integration

The Simple Way to Build a CBG Project.

Your Land. Your Feedstock. Your Project. Our Complete Solution.

Dhansa Labs provides a complete, technology-led EPC solution for compressed biogas projects — from feedstock assessment and technology selection through engineering, construction and commissioning. Instead of fitting every project into a standard plant configuration, we engineer the plant around your project.

Choose the inputs. We engineer the solution.
ISO 9001:2015 Certified Four Decades of Process Heritage Turnkey EPC — Design to Commissioning
1LandYou provide
2FeedstockYou provide
3TechnologyWe configure
4EPCWe execute
5CBGOperation-ready
Why Dhansa's approach is different

CBG Should Not Be a One-Size-Fits-All Project.

Every CBG project comes with a different set of conditions. These are the variables that decide what the plant actually needs.

Land Location Feedstock Feedstock Characteristics Feedstock Quantity Required CBG Capacity Water Availability Operating Conditions Digestate Utilisation FOM Requirements L-FOM Requirements Local Infrastructure Logistics Commercial Objectives
Input

Your project parameters

The land, feedstock and objectives you already have — no engineering terminology required.

Engineering

Dhansa Labs engineering

We don't begin with a fixed technology or equipment package. We assess the inputs and select the right combination of process technologies.

Output

A project-specific CBG configuration

A plant configured to your conditions — not a standard template forced onto your site.

We Configure the Technology Around the Project.

Not the project around the technology. That single decision changes everything downstream.

The Dhansa Labs project configurator

The Project Configurator

Five decisions. One integrated solution. Tell us what you have — Dhansa Labs determines how it should all work together, from digestion through to digestate management.

What goes into your CBG plant?

Step 01 · Feedstock

Your feedstock determines the foundation of the project — from digestion requirements through to downstream process design. Select everything you have available.

No engineering knowledge required

You simply provide the information you have. Dhansa Labs converts it into the appropriate engineering configuration.

Digestion technology

Step 02 · Digestion

The digestion platform is chosen to suit your feedstock and operating conditions — not the other way around.

The engineering principle

We don't force the feedstock into the technology. We select the technology around the feedstock.

From raw biogas to CBG

Step 03 · Purification

The appropriate purification system is selected according to gas composition, plant capacity, operating requirements and project economics.

Raw Biogas
From digestion
Purification
Configured to gas composition
CBG
Pipeline / cascade ready

The purification stage is matched to the plant, so the output meets compressed-biogas specification without over-engineering the system.

FOM management

Step 04 · Solid digestate

Solid digestate (FOM) management is configured around utilisation and project requirements, so the by-product becomes part of the project's value — not a disposal problem.

Resource cycle

Fermented Organic Manure is planned into the process from the start, alongside your feedstock and capacity decisions.

L-FOM management

Step 05 · Liquid digestate

Liquid digestate (L-FOM) management is integrated into the overall process and resource cycle, keeping water and nutrients moving through the plant efficiently.

Fully integrated

Liquid Fermented Organic Manure handling is designed together with digestion and water availability — one connected system.

Feedstock selected: 0 · Digestion: not set Start Configuring →
From technology selection to project execution

You Choose the Project Parameters. We Bring Everything Together.

Once the configuration is established, Dhansa Labs integrates the selected technologies and systems into one complete EPC solution.

Your project
Feedstock + Digestion + Gas Purification + FOM + L-FOM
Integration
Dhansa Labs — EPC & Technology Integration
DesignProcurementConstructionCommissioning
Delivered
Operation-Ready CBG Plant
01

Project Assessment

Feedstock, capacity, site and project requirements.

02

Engineering & Design

Technology selection, process design and integration.

03

Procurement

Equipment and technology procurement coordination.

04

Construction

Site execution, installation and project coordination.

05

Commissioning

Testing, integration and plant commissioning — handed over as an operation-ready facility.

One Project Multiple Technology Choices One Integrated EPC Partner
HOW IT WORKS A guided path

From First Conversation to Operational Plant.

You bring the project. We carry the engineering and execution at every step — no technical burden on your side.

1

Share your project

Tell us your location, available land, feedstock and target CBG capacity. No engineering detail required.

2

Feasibility & assessment

We evaluate feedstock characteristics, site conditions, capacity and project economics to confirm the right scope.

3

Technology configuration

We select and combine digestion, gas purification and FOM / L-FOM systems around your specific inputs.

4

Engineering & design

Detailed process and plant engineering, tailored to the configuration and your operating objectives.

5

Procurement & construction

Equipment procurement, civil works, installation and full on-site coordination — managed end to end.

6

Commissioning & handover

Testing, system integration and a fully operation-ready CBG plant handed over to you.

Why Dhansa Labs

Engineering the Next Generation of CBG Projects.

01

Technology-led, not technology-locked

Multiple technology options let us configure the project according to its actual requirements, rather than a single fixed package.

02

Project-specific engineering

Feedstock, land, capacity, logistics and commercial objectives all shape the plant configuration.

03

End-to-end integration

One partner across technology selection, design, procurement, construction and commissioning.

15 TPD Compressed Biogas plant, Bundi, Rajasthan 15 TPD Featured project photo · 15 TPD CBG, Bundi
Featured project

15 TPD CBG Project

Village Roteda, Tehsil Keshoraipatan, District Bundi, Rajasthan

Capacity15 TPDCompressed biogas
Project typeCBG PlantEPC project
LocationBundiRajasthan, India
MilestoneBhoomi PujanGroundbreaking · Aug 2026

A significant step towards developing cleaner energy infrastructure while creating sustainable value from agricultural and organic resources.

Explore Our Projects →
QUESTIONS, ANSWERED Before you reach out

Frequently Asked Questions

No. You provide the land, feedstock and target capacity — Dhansa Labs selects and configures the appropriate technology for your project.
We do, based on your feedstock and operating conditions. The technology is selected around the project, not the project forced into a fixed technology.
Napier and energy crops, agricultural residue, cattle dung, press mud, food and organic waste, industrial and municipal organic waste, and other biomass — individually or in combination.
Just your project location, available land, primary feedstock and quantity, and a target CBG capacity. If you're unsure of the capacity, select “I'm not sure” and we'll advise.
The complete EPC — project assessment, engineering & design, procurement, construction and commissioning — handed over as an operation-ready plant.
Solid (FOM) and liquid (L-FOM) digestate are planned into the process from the start as part of the resource cycle — a source of value, not a disposal problem.
Configure your project

Have Land? Have Feedstock? Let's Configure Your CBG Project.

You don't need to know which technology you need. Tell us what you have and what you want to build — our engineering team will determine the appropriate configuration for your project.

Step 01
Your project
Location, land, feedstock and capacity.
Step 02
Your details
How we reach you to discuss the configuration.
Step 01 of 02 — Project

Tell us about your project

Please enter a project location.
Acres
Enter the land available.
Select your primary feedstock.
TPD
Enter the available quantity.
Choose a capacity, or "I'm not sure".

No technology knowledge required · takes about a minute

Where should we send the configuration?

Please enter your name.
Please enter a valid phone number.
Please enter a valid email.

Your details are used only to discuss your project.

Project brief received

Thank you — our engineering team will review your inputs and come back with an appropriate CBG configuration for your project.